The battery trays are coming along nicely. We have two mounted in the rear and are working on getting the 4-pack rack mounted in the front.
At this point we are planning on the first powered test drive taking place in a week or two. However, we still have to run all the main power cable between the batteries, controller, and motor and finish installing all of the 80 lb batteries.